Lappland Guldprospektering
Interim Report Q3 2026 - Lappland Guldprospektering AB (publ)
Summary of significant events during the third quarter of 2026
13 July: Percussion drilling at Löparen outlined two gold anomalies, one of them previously unknown. The Company is following them up with closer-spaced drilling in winter 2026/2027.
31 August: The spring's four diamond core holes at Nya Gilleberget were fully reported. Gold was found in one hole, and the zone of 28.05 metres down-hole length at 2.30 grams of gold per tonne remains open. The Company decided to drill further towards it during the autumn.
4 September: The Company reported results from a further seven diamond core holes at Stortjärnhobben. Five of them returned gold intervals, including at greater depth than before. The results are to be included in the updated mineral resource.
11 September: The Mining Inspectorate of Sweden granted exploration permit Gubbträsk No. 102, giving the Company access to 84 of the area's 86 historical drill holes and the preserved drill cores. The aim is a mineral resource for Gubbträsk under PERC.
Significant events after the end of the reporting period
6 October: Field logging of the autumn's three diamond core holes at Nya Gilleberget showed mineralisation in all holes. Assay results are expected in the fourth quarter.
6 November: The Company announced that the Land and Environment Court of Appeal has summoned a hearing on 19 January 2027 on the land designation for Stortjärnhobben. The Company has access to the land while the appeal is examined.
Financial summary, third quarter of 2026 (July-September)
Comparative figures for the corresponding period of the previous financial year are stated in brackets ().
Income for the third quarter amounted to TSEK 0 (0) and earnings per share amounted to SEK -2.3 (-2.0).
The Group's result after tax for the third quarter amounted to TSEK -2,900 (-2,280). For the first nine months, the result after tax amounted to TSEK -8,431 (-4,525).
The Group's total assets amounted to TSEK 36,929 (20,595) as at 30 September 2026.
Cash and bank balances amounted to TSEK 16,709 (8,222) at the end of September 2026.
The equity ratio was 99.5 per cent (89.9).
CEO’s statement
In the third quarter our drilling at Stortjärnhobben answered the question it set out to answer: gold has also been encountered at greater depth. Five of seven new diamond core holes returned gold intervals, and we now have information on the deposit at greater depth than before. The results go into the updated mineral resource. At Gubbträsk we were granted a new permit with 84 historical drill holes and preserved drill cores, and the aim is a mineral resource there too. We ended the quarter with SEK 16.7 million in cash (8.2).
Stortjärnhobben is our principal project. Everything we do there is about making our assessment of the deposit more certain and preparing the basis for a decision on mining. With more and closer-spaced drill holes we want to lift parts of the resource from Inferred to Indicated, the category where mine planning and economic studies become possible.
The seven holes we reported on 4 September reached the mineralisation at greater depth in the southern part. The gold intervals lie between 14 and 279 metres down the holes, and the one containing the most gold was 5.1 metres down-hole length at 1.76 grams of gold per tonne in STH2026003. The resource is determined by a Competent Person, a specialist who meets the PERC Standard's requirements for assessing mineral resources, and a further qualified geologist will review the resource report. We will prepare the updated resource after the drilling and the coming trial mining, not in the fourth quarter as we stated on 6 November.
This autumn's and winter's drilling at Stortjärnhobben is aimed at mine planning. The holes are to provide data on the permeability of the rock ahead of the environmental permit for full-scale operation, and more detailed grades in the planned open pit. The application for an environmental permit for trial mining is with the County Administrative Board, which has not said when its decision will come. If the decision is granted with immediate enforcement, we can start shortly.
The Land and Environment Court of Appeal has summoned a hearing on 19 January 2027 on the Vapsten Sami village's appeal against the land designation. We have access to the land while the appeal is examined and are continuing our work there.
At Nya Gilleberget we reported the final results for the spring's four holes on 31 August, in line with the timetable in the previous interim report. The gold zone of 28.05 metres down-hole length at 2.30 grams of gold per tonne remains open. This autumn we planned two holes towards the zone, and when field logging showed mineralisation in both we drilled a third. The most extensive mineralisation is in GB202607, with three zones totalling 37.35 metres down-hole length. A Competent Person is reviewing the observations together with the assays, which we expect towards the end of the fourth quarter. On 9 October SVT Gävleborg reported on the work, and the feature was also shown on Rapport.
Gubbträsk No. 102, granted by the Mining Inspectorate of Sweden on 11 September, gives us 84 of the area's 86 historical drill holes, and our geologist is now going through the preserved cores. The percussion drilling at Löparen, which we reported on 13 July, outlined two gold anomalies, one of them previously unknown.
The result for the quarter was SEK -2.9 million (-2.3), of which SEK 1.4 million was exploration costs. Payments for investments in exploration assets were SEK 1.2 million in the quarter and SEK 5.9 million in the first nine months of the year.
Until the turn of the year we are working on the drilling at Stortjärnhobben, the assays from Nya Gilleberget and the review of Gubbträsk. This winter, closer-spaced drilling is planned around the anomalies at Löparen. The Company was founded in 1994. Thirty-two years later, our next step at Stortjärnhobben is the environmental permit, followed by trial mining, an updated resource and a first economic assessment ahead of a decision on mining.
Fredrik Johansson
CEO, Lappland Guldprospektering AB (publ)
For further information:
Fredrik Johansson, Chief Executive Officer
Lappland Guldprospektering AB (publ)
Telephone: +46 70 300 31 70
Email: fredrik.johansson@lapplandguld.se
www.lapplandguld.se
About the Company:
Lappland Guldprospektering AB (publ) is a Swedish exploration company, founded in 1994, focused on gold in Sweden. The Company’s main project is Stortjärnhobben in southern Lapland, for which an exploitation concession has been granted and where an Inferred mineral resource of 4.6 tonnes of gold has been reported in accordance with the PERC Reporting Standard. In addition to Stortjärnhobben, the Company holds, directly and through its wholly owned subsidiary Svensk Malmprospektering AB, twelve exploration permits, all including gold among the minerals covered, with several also including lead, copper, silver and zinc. The Company is listed on Spotlight Stock Market under the ticker LGOLD B and has its registered office in Stockholm and head office in Skellefteå.