Slipp dessa annonser och få en massa andra godsaker med vårt premiumabonnemang.

Skanska replaces Clifton bridge in north England, UK, for GBP 43M, about SEK 580M

Skanska will replace the Clifton rail bridge that spans the M6 motorway near Penrith, UK. The existing bridge will be demolished and replaced with a new 130 meter single span steel structure. The new bridge will be built alongside the existing structure, before being installed over a 10-day period early January 2026. Existing bridge support structures will be re-used, reducing programme timescales, cost and resultant carbon emissions.

Construction works have started with the project scheduled for completion in March 2026.