Skanska replaces bridge in Jurupa Valley, California, USA, for USD 59M about SEK 580M

The Mission Boulevard Bridge over the Santa Ana River supports regional mobility, safety, and improved access for Riverside County residents and travellers. Construction of the new bridge will include Mission style architecture with a parabolic soffit and raising the bridge 1.2-1.8 meters to maintain modern safety and flood standards.

Utility relocations, seismic retrofitting, improved drainage systems and environmental mitigation will shrink the project footprint, reducing ecological disruption while improving resilience against flooding. The project's environmental mitigation includes restoring over 3 hectares of streambed and habitat onsite and 0.7 hectares offsite to offset temporary impacts on fish and wildlife resources.

Work is slated to being in April 2026 and is expected to reach completion in September 2029.

Datum 2025-12-19, kl 07:30
Källa Cision
Vill du synas här? Kontakta hej@allaaktier.se. Vår sajt har 125 000 sidvisningar och 17 000 unika besökare per månad. Vår discord har 7800 medlemmar. Detta är aktiva sparare med ett stort aktieintresse. Behöver du nå ut till denna målgrupp så hör av dig!