Skanska rebuilds 7 Millbank in London, UK, for GBP 105M, about SEK 1.4 billion

Skanska will lead the construction of a new nine-storey office building with two basement levels. The design and build of approximately 12,100 square meter flexible workspace will include reconstruction of the original historic façade, which has been carefully deconstructed and stored before being rebuilt into the new structure to maintain and enhance the building's historic character.

The building is targeting environmental standards to achieve BREEAM Outstanding, WELL Platinum and Design for Performance to secure a Nabers 5* accreditation.

Construction will begin in July 2024 and is expected to be completed in January 2027.

Datum 2024-07-15, kl 07:30
Källa Cision
Kom igång med ditt sparande på bara några minuter! Hos Avanza handlar du aktier från 0 kr på Stockholmsbörsen och får tillbaka alla fondavgifter (ja, alla!) upp till 50 000 kr i samlat sparande. Kanske är det därför Avanza har Sveriges nöjdaste sparare 15 år i rad.
Investeringar innebär en risk