Lundin Mining Second Quarter 2023 Results

REG

TORONTO, August 2, 2023 /CNW/ - (TSX: LUN; Nasdaq Stockholm: LUMI) Lundin Mining Corporation (“Lundin Mining” or the “Company”) today reported net earnings attributable to Lundin Mining shareholders of $59.1 million ($0.08 per share) and  $205.7 million ($0.27 per share) for the three and six months ended June 30, 2023, respectively. The Company also generated adjusted earnings1 of $16.0 million ($0.02 per share) and adjusted EBITDA1 of $162.2 million in the second quarter. Adjusted earnings were $141.7 million  ($0.18 per share) and adjusted EBITDA were $499.1 million for the six months ended June 30, 2023. Adjusted operating cash flow1 were $110.6 million ($0.14 per share) and $345.7 million ($0.45 per share) for the three and six months ended June 30, 2023.

 

“Overall, we are pleased with the performance of our operations during the second quarter. We are currently tracking at the midpoint or higher for copper, gold and nickel guidance and the lower end for zinc. We generated adjusted EBITDA of over $160 million despite a decline in metal prices early in the second quarter and resulting provisional pricing adjustments. Lundin Mining’s earnings and cash-generation potential has further increased with the addition of Caserones which closed early in the third quarter. On a 100% proforma basis, including Caserones, Lundin Mining’s operations produced approximately 280,000 tonnes of copper-equivalent metal in the first half of this year. Caserones produced approximately 70,000 tonnes of copper in the first half of the year and is off to a strong start in the third quarter,” commented Peter Rockandel, CEO.

 

Mr. Rockandel added, “With the free cash flow from operations, the new $800 million Term Loan, and the existing $1.75 billion revolving credit facility, Lundin Mining retains a strong balance sheet and significant liquidity to progress growth projects.” 

 

Summary Financial Results 

           

 

Three months ended

June 30,

 

Six months ended

June 30,

US$ Millions (except per share amounts)

2023   

2022

 

2023   

2022   

Revenue

 588.5 

 590.2 

 

 1,339.9 

 1,581.3 

Gross profit

 52.8 

 46.0 

 

 266.2 

 524.8 

Attributable net earnings (loss)2

 59.1 

 (52.6)

 

 205.7 

 292.5 

Net earnings (loss)

 61.3 

 (48.6)

 

 226.6 

 329.5 

Adjusted earnings 1,2

 16.0 

 (35.3)

 

 141.7 

 260.3 

Adjusted EBITDA1

 162.2 

 148.6 

 

 499.1 

 736.4 

Basic and diluted earnings per share ("EPS")2

 0.08 

 (0.07)

 

 0.27 

 0.39 

Adjusted EPS1,2

 0.02 

 (0.05)

 

 0.18 

 0.35 

Cash flow from operations

 194.8 

 366.4 

 

 406.7 

 683.7 

Adjusted operating cash flow1

 110.6 

 49.7 

 

 345.7 

 522.6 

Adjusted operating cash flow per share1

 0.14 

 0.06 

 

 0.45 

 0.70 

Free cash flow from operations1

 20.7 

 266.3 

 

 91.8 

 461.1 

Free cash flow1

 (84.6)

 149.1 

 

 (118.8)

 321.5 

Cash and cash equivalents

 190.2 

 498.2 

 

 190.2 

 498.2 

Net debt1

 

 (229.8)

 469.9 

 

 (229.8)

 469.9 

1 These are non-GAAP measures. Please refer to the Company's discussion of non-GAAP and other performance measures in its Management's Discussion and Analysis for the three and six months ended June  30, 2023  and the Reconciliation of Non-GAAP Measures section at the end of this news release.

2 Attributable to shareholders of Lundin Mining Corporation.

 

 

Highlights

For the quarter ended June 30, 2023 the Company generated revenue of $588.5 million (Q2 2022 - $590.2 million), gross profit of $52.8 million (Q2 2022 - $46.0 million) and adjusted EBITDA of $162.2 million (Q2 2022 - $148.6 million).

 

Overall, the operations performed well during the second quarter of 2023 and the Company remains on track to achieve production guidance.

 

Operational Performance

 

Candelaria (80% owned): Candelaria produced 36,952 tonnes of copper, and approximately 21,000 ounces of gold in concentrate on a 100% basis in the quarter. Copper production was lower than the prior year quarter due to grades partially offset by higher throughput. Gold production was lower than the prior year quarter due to recoveries. Current quarter production costs and copper cash cost1 of $2.14/lb were higher than the prior year quarter largely owing to higher contractor and maintenance costs. Cash cost was further impacted by lower sales volumes.

 

Chapada (100% owned): Chapada produced 10,697 tonnes of copper and approximately 13,000 ounces of gold in concentrate in the quarter. Copper production was higher than the prior year quarter primarily due to higher recoveries in the quarter. Current quarter production for both metals was better than the first quarter of 2023, due to higher grades and recoveries. In aggregate, production costs were higher than the prior year comparable quarter due to higher sales volumes achieved, while the higher sales volumes also led to improvement on a unit basis with a copper cash cost of$2.69/lb for the quarter.

 

Eagle (100% owned): During the quarter Eagle produced 4,686 tonnes of nickel and 3,881 tonnes of copper which were lower than the prior year quarter due to lower grades and lower throughput. Production costs were lower than the comparable prior year quarter due to lower consumable costs. Nickel cash cost in the quarter of $1.88/lb was higher than the prior year quarter due primarily to lower by-product copper price and lower sales volumes.

 

Neves-Corvo (100% owned): Neves-Corvo produced 7,610 tonnes of copper for the quarter and 24,177 tonnes of zinc. Copper production was lower than the prior year comparable quarter, due to lower grades, while zinc production was higher primarily due to increased throughput and recoveries driven by the ramp-up of the Zinc Expansion Project (“ZEP”). Production costs were comparable to the prior year quarter. Copper cash cost of $3.99/lb was higher than the prior year quarter due primarily to lower copper sales volumes. 

 

Zinkgruvan (100% owned): Zinc production of 11,938 tonnes and lead production of 3,816 tonnes were lower than the prior year quarter due to lower throughput due to a shut-down of the mill to perform the planned implementation of the sequential flotation circuit. Copper production of 917 tonnes was higher than the prior year quarter due to higher grades. Production costs were lower than the prior year quarter due to lower mine and mill costs. Zinc cash cost of $0.24/lb was lower than the prior year quarter due to lower production costs.

 

Total Production

(contained metal)a

2023

2022

YTD

Q2

Q1

Total

Q4

Q3

Q2

Q1

Copper (t)b

 121,519 

 60,057 

 61,462 

 249,659 

 56,552 

 63,930 

 64,096 

 65,081 

Zinc (t)

 84,668 

 36,115 

 48,553 

 158,938 

 44,308 

 40,327 

 41,912 

 32,391 

Gold (koz)b

 70 

 34 

 36 

 154 

 36 

 45 

 39 

 34 

Nickel (t)

 8,410 

 4,686 

 3,724 

 17,475 

 4,096 

 4,379 

 4,719 

 4,281 

a. Tonnes (t) and thousands of ounces (koz)

b.  Candelaria's production is on a 100% basis.

 1 These are non-GAAP measures. Please refer to the Company's discussion of non-GAAP and other performance measures in its Management's Discussion and Analysis for the three and six months ended June 30, 2023  and the Reconciliation of Non-GAAP Measures section at the end of this news release.

Corporate Updates

 

          On July 10, 2023, the Company published its 2022 Sustainability Report.

 

          On July 13, 2023, the Company announced the closing of the acquisition of 51% of the issued and outstanding equity of SCM Minera Lumina Copper Chile ("Lumina Copper"), which owns the Caserones copper-molybdenum mine ("Caserones") located in Chile. The Company paid an aggregate of approximately $800 million in cash consideration at closing. Remaining deferred cash consideration of $150 million will be payable in installments over the six-year period following the closing date. Lundin Mining also has the right to acquire up to an additional 19% interest in Lumina Copper for $350 million over a five-year period commencing on the first anniversary of the date of closing. A technical report for the Caserones mine titled “Caserones Mining Operation, Chile, NI 43-101 Technical Report on the Caserones Mining Operation” was filed under the Company's profile.

 

          On July 27, 2023, the Company announced it had obtained a three-year term loan ("Term Loan") in a principal amount of $800 million with an additional $400 million accordion and closing of up to an additional 19% interest in Lumina Copper.

Financial Performance

 

          Gross profit for the quarter ended June 30, 2023 was $52.8 million, an increase of $6.8 million and largely comparable to the prior year quarter. On a year-to-date basis, gross profit for the period ended June 30, 2023 was $266.2 million and was lower than the prior year period due to lower sales volumes and lower metal prices.

 

          For the three months ended June 30, 2023, net earnings of $61.3 million were $109.9 million higher than the prior year quarter due primarily to lower general exploration and business development costs and lower income taxes. On a year-to-date basis net earnings of $226.6 million were lower than the prior year period due to lower gross profit resulting from lower realized prices, partially offset by lower taxes.

          Adjusted earnings for the three months ended June 30, 2023, of $16.0 million were $51.3 million higher than the adjusted loss of the prior year quarter due to the same factors as the change in net earnings described above. On a year-to-date basis adjusted earnings of $141.7 million were lower than the prior year period due to lower gross profit partially offset by lower income taxes.

 

Financial Position and Financing  

 

          Cash and cash equivalents as at June 30, 2023 was $190.2 million. Cash flow from operations of $194.8 million was used to fund investing activities of $283.5 million. Cash from financing activities was $99.9 million, which was comprised primarily of the proceeds from debt on a net basis partially offset by dividends paid to shareholders. Cash and cash equivalents remained relatively unchanged during the six months ended June 30, 2023.

 

          As at June 30, 2023, the Company had a net debt balance of $229.8 million.

 

          As at August 2, 2023, the Company had cash and net debt balances of approximately $270.0 million and $930.0 million, respectively. The net debt increase was attributable to debt financing of the acquisition of Caserones.

 

Outlook

Overall, the operations performed well during the second quarter of 2023. The Company is currently tracking to the midpoint or higher for copper, gold and nickel guidance and the lower end for zinc. Production continues to be weighted to the second half of the year. Candelaria and Eagle production is forecast to be modestly weighted to the second half of the year, primarily owing to mine sequencing and the resultant grade profiles. Chapada production is forecast to be weighted to the second half of the year due to first half seasonal operating considerations, and forecast grade and recovery profiles.

Expected cash costs remain consistent with reported guidance for Candelaria, Caserones and Neves-Corvo. Chapada’s cash cost guidance range has been improved to $2.35 - $2.55/lb of copper, reflecting lower pricing of consumables. Eagle’s forecast nickel cash cost guidance has been increased to $2.30 - $2.45/lb of nickel. While Eagle’s overall operating costs remain consistent with the Company’s previous expectations, nickel cash cost guidance has been increased primarily driven by lower by-product credits, mainly pricing. Zinkgruvan’s cash cost guidance has been improved to $0.45 - $0.50/lb of zinc, reflecting greater by-product credits.

 

A reduction in capital expenditure guidance is expected for the remainder of the year as the timing of several projects at Candelaria has been deferred into next year. At Josemaria, foreign exchange, a delay in planned equipment deliveries and reduced activities have lowered capital spend guidance.

 

2023 Production and Cash Cost Guidance

 

 

 

 

Previous Guidancea

Revised Guidance

 

(contained metal)

Production

Cash Cost ($/lb)

Production

Cash Cost ($/lb)b

 

Copper (t)

Candelaria (100%)

145,000 - 155,000

1.80 – 1.95c

145,000 - 155,000

1.80 – 1.95c

 

 

Caserones (100%)e

60,000 - 65,000

2.30 - 2.45

60,000 - 65,000

2.30 - 2.45

 

 

Chapada

43,000 - 48,000

2.55 – 2.75d

43,000 - 48,000

2.35 – 2.55d

 

 

Eagle

12,000 - 15,000

 

12,000 - 15,000

 

 

 

Neves-Corvo

33,000 - 38,000

2.10 – 2.30c

33,000 - 38,000

2.10 – 2.30c

 

 

Zinkgruvan

3,000 - 4,000

 

3,000 - 4,000

 

 

 

Total

296,000 - 325,000

 

296,000 - 325,000

 

 

Zinc (t)

Neves-Corvo

100,000 - 110,000

 

100,000 - 110,000

 

 

 

Zinkgruvan

80,000 - 85,000

0.60 – 0.65c

80,000 - 85,000

0.45 – 0.50c

 

 

Total

180,000 - 195,000

 

180,000 - 195,000

 

 

Molybdenum (t)

Caserones (100%)e

1,500 - 2,000

 

1,500 - 2,000

 

 

Gold (koz)

Candelaria (100%)

85 - 90

 

85 - 90

 

 

 

Chapada

55 - 60

 

55 - 60

 

 

 

Total

140 - 150

 

140 - 150

 

 

Nickel (t)

Eagle

13,000 - 16,000

1.50 – 1.65

13,000 - 16,000

2.30 – 2.45

a. Guidance as outlined in the MD&A for the year ended December 31, 2022 and for Caserones as outlined in the news release "Lundin Mining Announces Closing of the Acquisition of Majority Interest in Caserones Copper-Molybdenum Mine in Chile and Commitments for New $800 Million Term Loan" provided on July 13, 2023.

b. Cash costs are based on various assumptions and estimates, including but not limited to: production volumes, commodity prices (Cu: $3.75/lb, Zn: $1.30/lb, Mo: $20.00/lb Pb: $0.90/lb, Au: $1,850/oz), foreign exchange rates (€/USD:1.00, USD/SEK:10.50, USD/CLP:800, USD/BRL:5.00) and production costs for the remainder of 2023.

c. 68% of Candelaria's total gold and silver production are subject to a streaming agreement, and silver production at Zinkgruvan and Neves-Corvo are also subject to streaming agreements. Cash costs are calculated based on receipt of approximately $425/oz gold and $4.25/oz to $4.57/oz silver.

d. Chapada’s cash cost is calculated on a by-product basis and does not include the effects of its copper stream agreements. Effects of the copper stream agreements are reflected in copper revenue and will impact realized price per pound.

e. Caserones guidance is for the  second half of 2023. Closing of the Caserones Acquisition occurred on July 13, 2023.

 

 

2023 Capital Expenditureb

 

 

($ millions)

Previous Guidancea

Revisions

Revised Guidance

 

Candelaria (100% basis)

400

(25)

375

 

Caserones (100% basis)c

110

110

 

Chapada

70

70

 

Eagle

20

20

 

Neves-Corvo

130

130

 

Zinkgruvan

70

70

 

Other

10

10

 

Total Sustaining

810

(25)

785

 

Josemaria

400

(50)

350

 

Total Capital Expenditures

1,210

(75)

1,135

 

a. Guidance as outlined in the  MD&A for the year ended December 31, 2022 and for Caserones as outlined in the news release "Lundin Mining Announces Closing of the Acquisition of Majority Interest in Caserones Copper-Molybdenum Mine in Chile and Commitments for New $800 Million Term Loan" provided on July 13, 2023.                                                                                                                                                                                                      

b. Sustaining capital expenditure is a supplementary financial measure, and expansionary capital expenditure is a non-GAAP measure - see the Company's Management Discussion and Analysis for the three and six months ended June 30, 2023 and the Reconciliation of Non-GAAP Measures at the end of this news release.                                                                                                                                                                                                                        

c. Caserones guidance is for the  second half of 2023. Closing of the Caserones Acquisition occurred on July 13, 2023.

 

2023 Exploration Investment Guidance

 

Total exploration expenditures are on target to be $45.0 million in 2023, unchanged from previous guidance.

 

Senior Leadership Appointments

 

The Company would also like to announce the executive appointments of Cara Allaway as Vice President, Finance, Steve Little as Vice President, Technology and Innovation, Tim Walmsley as Vice President, Exploration and Stephen Williams as Vice President, Investor Relations.

 

Cara Allaway

Ms. Allaway has joined Lundin Mining’s Senior Leadership Team as Vice President, Finance. In her previous role with Eldorado Gold, Cara was Vice President, Finance, where she was responsible for overseeing accounting, financial reporting and planning and analysis functions. Previous to Eldorado Gold, she held similar roles at Nevsun Resources Ltd. and Dominion Diamond Mines, and spent 12 years at PwC in the Assurance groups in Halifax and Toronto, and in the Capital Markets Group in Russia. Cara is a Chartered Professional Accountant and holds a Bachelor of Science in Chemistry from Mount Allison University and a Master of Management and Professional Accounting from the University of Toronto.

 

Steve Little

Mr. Little has joined Lundin Mining’s Senior Leadership Team as Vice President, Technology and Innovation. He has over 30 years of experience in providing technology leadership within asset intensive industries such as power generation and heavy manufacturing, as well as high tech. Prior to joining Lundin Mining, he was most recently Vice President, Business Technology Solutions for Seaspan Shipyards and Seaspan Marine Transportation. A registered Professional Engineer, Mr. Little holds a Bachelor of Engineering (Electrical) from the Royal Military College of Canada and an MBA from Queen's University.

 

Tim Walmsley

Mr. Walmsley is the Vice President, Exploration for Lundin Mining and has more than 30 years of international experience in all stages of mineral exploration.  Prior to his VP position, he held the role of Senior Director, Exploration.  Timothy joined Lundin Mining as Chile Exploration Manager in 2013.  Before joining Lundin Mining, Timothy held progressively more senior technical roles with Xstrata plc, Falconbridge Limited, and Noranda Inc., based initially in Canada and then primarily in Chile.

 

During his career Mr. Walmsley has been responsible for various aspects of exploration and new business development throughout much of North and South America and has contributed to numerous mineral deposit discoveries.

 

Timothy holds a Bachelor of Applied Science (Honours) in Geological Engineering from Queen's University in Canada.

 

Stephen Williams

Mr. Williams has joined Lundin Mining’s Senior Leadership Team as Vice President, Investor Relations. Stephen is joining from Bluestone Resources, where he was the Vice President, Corporate Development & Investor Relations. Previously he was a member of the Metals & Mining investment banking team at Canaccord Genuity Corp, where he provided strategic advice to clients on acquisitions, mergers, and equity financings.

 

Stephen is a professional engineer by background having worked for Freeport-McMoRan in an operational and process development capacity. He holds a B.A.Sc. in Metallurgical Engineering from the University of British Columbia and an MBA from the W. P. Carey School of Business, Arizona State University.

 

The information in this release is subject to the disclosure requirements of Lundin Mining under the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out below on August 2, 2023 at 5:30 pm Eastern Time.

 

Technical Information

 

The scientific and technical information in this press release has been prepared in accordance with the disclosure standards of National Instrument 43-101 (“NI 43-101”) and has been reviewed by Arman Barha, P.Eng., Vice President, Technical Services, a "Qualified Person" under NI 43-101. Mr. Barha has verified the data disclosed in this release and no limitations were imposed on his verification process.

Reconciliation of Non-GAAP Measures  

The Company uses certain performance measures in its analysis. These performance measures have no standardized meaning within generally accepted accounting principles under International Financial Reporting Standards and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. For additional details please refer to the Company’s discussion of non-GAAP and other performance measures in its Management’s Discussion and Analysis for the three and six months ended June 30, 2023 which is available on SEDAR at www.sedar.com.

 

Adjusted EBITDA can be reconciled to the Company's Consolidated Statement of Earnings as follows:

 

 

Three months ended

June 30,

 

Six months ended

June 30,

($thousands)

2023

2022

 

2023

2022

Net earnings (loss)

 61,302 

 (48,626)

 

 226,613 

 329,483 

Add back:

 

 

 

 

 

Depreciation, depletion and amortization   

 130,505 

 142,042 

 

 250,752 

 271,879 

Finance income and costs

 15,897 

 17,309 

 

 31,596 

 32,281 

Income taxes

 (19,601)

 49,003 

 

 29,092 

 126,209 

    

 188,103 

 159,728 

 

 538,053 

 759,852 

Unrealized foreign exchange

 (19,285)

 2,721 

 

 (10,641)

 10,574 

Revaluation gain on derivatives

 (14,783)

 (19,593)

 

 (34,033)

 (16,300)

Sinkhole costs

 11,900 

  

 

 16,482 

  

Revaluation gain on marketable securities

 (3,464)

 1,626 

 

 (3,902)

 (2,266)

Gain on disposal of subsidiary

  

  

 

 (5,718)

 (16,828)

Other

 (283)

 4,161 

 

 (1,110)

 1,385 

Total adjustments - EBITDA

 (25,915)

 (11,085)

 

 (38,922)

 (23,435)

Adjusted EBITDA

 162,188 

 148,643 

 

 499,131 

 736,417 

 

 

 

 

 

 

                     

 

Adjusted earnings and adjusted earnings per share can be reconciled to the Company's Consolidated Statement of Earnings as follows:

 

 

Three months ended

June 30,

 

Six months ended

June 30,

($thousands, except share and per share amounts)

2023

2022

 

2023

2022

Net earnings (loss) attributable to Lundin Mining shareholders

 59,109 

 (52,577)

 

 205,729 

 292,501 

Add back:

 

 

 

 

 

Total adjustments - EBITDA

 (25,915)

 (11,085)

 

 (38,922)

 (23,435) 

Tax effect on adjustments

 (554)

 5,035 

 

 (3,180)

 3,001 

Deferred tax arising from foreign exchange translation

 (15,989)

 23,091 

 

 (21,996)

 (11,863) 

Other

 (634)

 260 

 

 69 

 128 

Total adjustments

 (43,092)

 17,301 

 

 (64,029)

 (32,169) 

Adjusted earnings    

 16,017 

 (35,276)

 

 141,700 

 260,332 

 

 

 

 

 

 

Basic weighted average number of shares outstanding

 772,255,656 

 766,775,032 

 

 771,739,532 

 751,676,764 

 

 

 

 

 

 

Net earnings (loss) attributable to shareholders   

 0.08 

 (0.07)

 

 0.27 

 0.39 

Total adjustments   

 (0.06)

 0.02 

 

 (0.09)

 (0.04)

Adjusted earnings per share   

 0.02 

 (0.05)

 

 0.18 

 0.35 

 

Adjusted operating cash flow and adjusted operating cash flow per share can be reconciled to cash provided by operating activities as follows:

 

  

 

Three months ended

June 30,

 

Six months ended

June 30,

($thousands, except share and per share amounts)

2023

2022

 

2023

2022

Cash provided by operating activities

 194,844 

 366,411 

 

 406,719 

 683,668 

Changes in non-cash working capital items

 (84,207)

 (316,665)

 

 (61,015)

 (161,117) 

Adjusted operating cash flow    

 110,637 

 49,746 

 

 345,704 

 522,551 

 

 

 

 

 

 

Basic weighted average number of shares outstanding

 772,255,656 

 766,775,032

 

 771,739,532 

 751,676,764

Adjusted operating cash flow per share   

$ 0.14 

 0.06 

 

 0.45 

 0.70 

          

Free cash flow from operations can be reconciled to cash provided by operating activities as follows:

   

 

Three months ended

June 30,

 

Six months ended

June 30,

($thousands)

2023

2022

 

2023

2022

Cash provided by operating activities

 194,844 

 366,411 

 

 406,719 

 683,668 

Sustaining capital expenditures

 (187,820)

 (151,665)

 

 (343,384)

 (282,423)

General exploration and business development

 13,693 

 51,531 

 

 28,458 

 59,813 

Free cash flow from operations

 20,717 

 266,277 

 

 91,793 

 461,058 

General exploration and business development

 (13,693)

 (51,531)

 

 (28,458)

 (59,813)

Expansionary capital expenditures

 (91,650)

 (65,603)

 

 (182,169)

 (79,757)

Free cash flow

 (84,626)

 149,143 

 

 (118,834)

 321,488 

 

Net (debt) cash can be reconciled as follows:

 

($thousands)

June 30, 2023

December 31, 2022

Cash and cash equivalents

 190,182 

 191,387 

Current portion of total debt and lease liabilities  

 (284,656)

 (170,149)

Debt and lease liabilities

 (130,359)

 (27,179)

 

 (415,015)

 (197,328)

Deferred financing fees (netted in above)

 (4,998)

 (4,926)

 

 (420,013)

 (202,254)

Net debt

 (229,831)

 (10,867)

 

 

 

 

 

Cash and All-in Sustaining Costs can be reconciled to the Company's operating costs as follows:

 

 

Six months ended June 30, 2023

 

 

 

Operations

 Candelaria

Chapada

Eagle

Neves-Corvo

Zinkgruvan

 

 

($000s, unless otherwise noted)

(Cu)

(Cu) 

(Ni)

 (Cu)

(Zn)

Total

 

Sales volumes (Contained metal):

 

 

 

 

 

 

Tonnes    

 71,917 

 19,236 

 6,594 

 14,201 

 25,986 

  

  

 

Pounds (000s)

 158,550 

 42,408 

 14,537 

 31,308 

 57,289 

  

 

Production costs   

 

 

 

 

 

 

 

 

 

 

 822,962 

 

Less: Royalties and other

 

 

 

 

 

 (20,055)

 

 

 

 

 

 

 

 802,907 

 

Deduct: By-product credits

 

 

 

 

 

 (279,601)

 

Add: Treatment and refining

 

 

 

 

 

 69,129 

 

Cash cost

 345,212 

 107,669 

 30,630 

 84,163 

 24,761 

 592,435 

 

Cash cost per pound ($/lb)

 2.18 

 2.54 

 2.11 

 2.69 

 0.43 

  

 

Add: Sustaining capital  

 214,103 

 35,717 

 10,664 

 47,194 

 30,462 

  

  

 

Royalties

  

 4,252 

 10,606 

 1,813 

  

  

 

Reclamation and other closure accretion and depreciation

 4,751 

 3,648 

 5,969 

 2,620 

 1,800 

  

 

Leases & other

 6,797 

 2,137 

 1,644 

 306 

 202 

  

 

All-in sustaining cost

 570,863 

 153,423 

 59,513 

 136,096 

 57,225 

  

 

AISC per pound ($/lb)

 3.60 

 3.62 

 4.09 

 4.35 

 1.00 

  

 

($000s, unless otherwise noted)

2023 Guidance

 

 

Cash cost

 620,000 

 260,000 

 90,000 

 180,000 

 90,000 

 

 

Cash cost per pound($/lb)

1.80 – 1.95

2.35 – 2.55

2.30 – 2.45

2.10 – 2.30

0.45 – 0.50

 

 

 

 

 

 

 

 

 

 

 

 

Six months ended June 30, 2022

 

 

Operations

Candelaria

Chapada

Eagle

Neves-

Zinkgruvan

 

($000s, unless otherwise noted)

(Cu)

(Cu) 

(Ni)

 (Cu)

(Zn)

Total

Sales volumes (Contained metal):

 

 

 

 

 

Tonnes    

 78,103 

 20,709 

 7,473 

 16,667 

 34,327 

  

  

Pounds (000s)

 172,187 

 45,655 

 16,475 

 36,744 

 75,678 

  

Production costs   

 

 

 

 

 

 

 

 

 

 

 784,617 

Less: Royalties and other

 

 

 

 

 

 (29,528)

 

 

 

 

 

 

 755,089 

Deduct: By-product credits

 

 

 

 

 

 (315,735)

Add: Treatment and refining

 

 

 

 

 

 62,115 

Cash cost

 296,225 

 103,309 

 (638) 

 75,001 

 27,572 

 501,469 

Cash cost per pound ($/lb)

 1.72 

 2.26 

 (0.04)

 2.04 

 0.36 

  

Add: Sustaining capital  

 169,071 

 44,215 

 7,383 

 33,276 

 23,122 

  

  

Royalties

  

 6,106 

 18,424 

 2,197 

  

  

Reclamation and other closure accretion and depreciation

 4,051 

 3,749 

 9,300 

 451 

 2,073 

  

Leases & other

 4,626 

 2,039 

 1,282 

 396 

 398 

  

All-in sustaining cost

 473,973 

 159,417 

 35,751 

 111,321 

 53,165 

  

AISC per pound ($/lb)

 2.75 

 3.49 

 2.17 

 3.03 

 0.70 

  

 

         

 

Three months ended June 30, 2023

 

 

Operations

Candelaria

Chapada

Eagle

Neves-Corvo

Zinkgruvan

 

($000s, unless otherwise noted)

(Cu)

(Cu) 

(Ni)

 (Cu)

(Zn)

Total

Sales volumes (Contained metal):

 

 

 

 

 

Tonnes    

 36,347 

 10,164 

 3,859 

 6,170 

 9,374 

  

  

Pounds (000s)

 80,132 

 22,408 

 8,507 

 13,603 

 20,666 

  

Production costs   

 

 

 

 

 

 

 

 

 

 

 405,198 

Less: Royalties and other

 

 

 

 

 

 (7,969)

 

 

 

 

 

 

 397,229 

Deduct: By-product credits

 

 

 

 

 

 (122,636)

Add: Treatment and refining

 

 

 

 

 

 32,514 

Cash cost

 171,520 

 60,351 

 15,990 

 54,271 

 4,975 

 307,107 

Cash cost per pound ($/lb)

 2.14 

 2.69 

 1.88 

 3.99 

 0.24 

  

Add: Sustaining capital  

 123,417 

 19,690 

 3,562 

 22,133 

 15,994 

  

  

Royalties

  

 2,029 

 4,920 

 83 

  

  

Interest expense

 2,444 

 1,847 

 3,011 

 1,296 

 739 

  

Leases & other

 3,654 

 1,171 

 897 

 148 

 100 

  

All-in sustaining cost

 301,035 

 85,088 

 28,380 

 77,931 

 21,808 

  

AISC per pound ($/lb)

 3.76 

 3.80 

 3.34 

 5.73 

 1.06 

  

   

 

Three months ended June 30, 2022

 

 

Operations

Candelaria

Chapada

Eagle

Neves-Corvo

Zinkgruvan

 

($000s, unless otherwise noted)

(Cu)

(Cu) 

(Ni)

 (Cu)

(Zn)

Total

Sales volumes (Contained metal):

 

 

 

 

 

Tonnes    

 39,655 

 7,905 

 4,206 

 8,183 

 18,525 

  

  

Pounds (000s)

 87,424 

 17,427 

 9,273 

 18,040 

 40,841 

  

Production costs

 

 

 

 

 

 

 

 

 

 

 402,190 

Less: Royalties and other

 

 

 

 

 

 (13,657)

 

 

 

 

 

 

 388,533 

Deduct: By-product credits

 

 

 

 

 

 (134,728)

Add: Treatment and refining

 

 

 

 

 

 29,960 

Cash cost

 162,240 

 51,872 

 8,341 

 43,198 

 18,114 

 283,765 

Cash cost per pound ($/lb)

 1.86 

 2.98 

 0.90 

 2.39 

 0.44 

  

Add: Sustaining capital  

 86,107 

 29,760 

 2,923 

 13,760 

 14,083 

  

  

Royalties

  

 2,442 

 10,633 

 (616) 

  

  

Interest expense

 2,082 

 1,865 

 4,683 

 120 

 956 

  

Leases & other

 2,658 

 1,110 

 631 

 194 

 160 

  

All-in sustaining cost

 253,087 

 87,049 

 27,211 

 56,656 

 33,313 

  

AISC per pound ($/lb)

 2.89 

 5.00 

 2.93 

 3.14 

 0.82 

  

 

Cautionary Statement on Forward-Looking Information

Certain of the statements made and information contained herein is “forward-looking information” within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to statements regarding the Company’s plans, prospects and business strategies; the Company’s guidance on the timing and amount of future production and its expectations regarding the results of operations; expected costs; permitting requirements and timelines; timing and possible outcome of pending litigation; the results of any Preliminary Economic Assessment, Feasibility Study, or Mineral Resource and Mineral Reserve estimations, life of mine estimates, and mine and mine closure plans; anticipated market prices of metals, currency exchange rates, and interest rates; the development and implementation of the Company’s Responsible Mining Management System; the Company’s ability to comply with contractual and permitting or other regulatory requirements; anticipated exploration and development activities at the Company’s projects; the Company’s integration of acquisitions and any anticipated benefits thereof, including the Caserones transaction; and expectations for other economic, business, and/or competitive factors. Words such as “believe”, “expect”, “anticipate”, “contemplate”, “target”, “plan”, “goal”, “aim”, “intend”, “continue”, “budget”, “estimate”, “may”, “will”, “can”, “could”, “should”, “schedule” and similar expressions identify forward-looking statements.

 

Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management, including that the Company can access financing, appropriate equipment and sufficient labour; assumed and future price of copper, nickel, zinc, gold and other metals; anticipated costs; ability to achieve goals; the prompt and effective integration of acquisitions; that the political environment in which the Company operates will continue to support the development and operation of mining projects; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by Lundin Mining as at the date of this document in light of management’s experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: global financial conditions, market volatility and inflation, including pricing and availability of key supplies and services; risks inherent in mining including but not limited to risks to the environment, industrial accidents, catastrophic equipment failures, unusual or unexpected geological formations or unstable ground conditions, and natural phenomena such as earthquakes, flooding or unusually severe weather; uninsurable risks; project financing risks, liquidity risks and limited financial resources; volatility and fluctuations in metal and commodity demand and prices; delays or the inability to obtain, retain or comply with permits; significant reliance on a single asset; reputation risks related to negative publicity with respect to the Company or the mining industry in general; health and safety risks; risks relating to the development of the Josemaria Project; inability to attract and retain highly skilled employees; risks associated with climate change; compliance with environmental, health and safety laws and regulations; unavailable or inaccessible infrastructure, infrastructure failures, and risks related to ageing infrastructure; risks inherent in and/or associated with operating in foreign countries and emerging markets, including with respect to foreign exchange and capital controls; economic, political and social instability and mining regime changes in the Company’s operating jurisdictions, including but not limited to those related to permitting and approvals, environmental and tailings management, labour, trade relations, and transportation; risks relating to indebtedness; the inability to effectively compete in the industry; risks associated with acquisitions and related integration efforts, including the ability to achieve anticipated benefits, unanticipated difficulties or expenditures relating to integration and diversion of management time on integration, including with respect to the Caserones transaction; changing taxation regimes; risks related to mine closure activities, reclamation obligations, environmental liabilities and closed and historical sites; reliance on key personnel and reporting and oversight systems, as well as third parties and consultants in foreign jurisdictions; information technology and cybersecurity risks; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits including but not limited to models relating thereto; actual ore mined and/or metal recoveries varying from Mineral Resource and Mineral Reserve estimates, estimates of grade, tonnage, dilution, mine plans and metallurgical and other characteristics; ore processing efficiency; community and stakeholder opposition; financial projections, including estimates of future expenditures and cash costs, and estimates of future production may not be reliable; enforcing legal rights in foreign jurisdictions; environmental and regulatory risks associated with the structural stability of waste rock dumps or tailings storage facilities; activist shareholders and proxy solicitation matters; risks relating to dilution; regulatory investigations, enforcement, sanctions and/or related or other litigation; risks relating to payment of dividends; counterparty and customer concentration risks; the estimation of asset carrying values; risks associated with the use of derivatives; relationships with employees and contractors, and the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; conflicts of interest; existence of a significant shareholder; exchange rate fluctuations; challenges or defects in title; internal controls; compliance with foreign laws; potential for the allegation of fraud and corruption involving the Company, its customers, suppliers or employees, or the allegation of improper or discriminatory employment practices, or human rights violations; the threat associated with outbreaks of viruses and infectious diseases; risks relating to minor elements contained in concentrate products; and other risks and uncertainties, including but not limited to those described in the “Risk and Uncertainties” section of the Company’s Annual Information Form and the “Managing Risks” section of the Company’s MD&A for the year ended December 31, 2022, which are available on SEDAR at www.sedar.com under the Company’s profile.

 

All of the forward-looking statements made in this document are qualified by these cautionary statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, forecast or intended and readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking information. Accordingly, there can be no assurance that forward-looking information will prove to be accurate and forward-looking information is not a guarantee of future performance. Readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this document. The Company disclaims any intention or obligation to update or revise forward-looking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.

Datum 2023-08-02, kl 23:30
Källa Cision
Vill du synas här? Kontakta hej@allaaktier.se. Vår sajt har 100 000 sidvisningar och 10 000 unika besökare per månad. Vår discord har över 5000 medlemmar. Detta är aktiva sparare med ett stort aktieintresse. Behöver du nå ut till denna målgrupp så hör av dig!